Blue Fox
Senior Member
- Joined
- Dec 12, 2008
- Messages
- 351
- Reaction score
- 1
Hello all,
Just had a call to accept a quote I did last week, basically customer wants a couple of light switches moving and a plug socket, and after explaining the requirements for rcd protection they decided to get their fuse box which was the same model used on the titanic changed for a new c/u. Thinking there could be some problems with this house I intend to complete the chasings and move the switches and socket along with the inspecting on 1 day then go back in a couple of weeks to fit the new c/u - this is due to them having a chippy in to build a cupboard to fit everything in. Is this a problem as I will be doing work on the circuits without rcd protection for a couple of weeks?
Just had a call to accept a quote I did last week, basically customer wants a couple of light switches moving and a plug socket, and after explaining the requirements for rcd protection they decided to get their fuse box which was the same model used on the titanic changed for a new c/u. Thinking there could be some problems with this house I intend to complete the chasings and move the switches and socket along with the inspecting on 1 day then go back in a couple of weeks to fit the new c/u - this is due to them having a chippy in to build a cupboard to fit everything in. Is this a problem as I will be doing work on the circuits without rcd protection for a couple of weeks?