Mr Sworld
Electrical Technician
- Joined
- Mar 21, 2008
- Messages
- 1,152
- Reaction score
- 0
As much as I hate it, it's one of the duties I have to perform. However it will take me about five minutes per item for a full test. Removing equipment, visual check of the lead and casing, checking the fuse is the correct size. Then if an earth bond is required it can take a couple of tries to find a suitable point to get a reading. Insulation test and then the load test/leakage test.
However I bumping into a guy testing in one of our other sites the other day (they've subbed it out) and got talking to him. His company charge
However I bumping into a guy testing in one of our other sites the other day (they've subbed it out) and got talking to him. His company charge