I see in this months edition of the Electrical Safety mag ( forgot the name), the commitee that has been deliberating on whether to grant permission for contractors to remove and re-seal main fuses has decided against it and to leave things as they are. I think they said it was EDL who were against it . ( There is an EDL is'nt there?)
Anyway its been kicked into touch so we are left with the present, pathetically stupid situation of waiting forever for someone to turn up and yank a fuse out for you.
I'm just looking at a job at a vets surgery ( not Apache's) of removing six C/U's , two redundant meters, a right mess of meter tails and fitting one fuseboard. Have to be done on a Sunday, 2 phase supply, who thinks the DNO will come and pull the fuses in the morning and back in , late afternoon.
Anyway its been kicked into touch so we are left with the present, pathetically stupid situation of waiting forever for someone to turn up and yank a fuse out for you.
I'm just looking at a job at a vets surgery ( not Apache's) of removing six C/U's , two redundant meters, a right mess of meter tails and fitting one fuseboard. Have to be done on a Sunday, 2 phase supply, who thinks the DNO will come and pull the fuses in the morning and back in , late afternoon.