Putting a new 70mm² 3c SWA feed in to an old MCC we ran in to a slight problem.
Two options:
1/ Run the new feed down the wall at back the of the MCC through the floor and double back in to the bottom as the original feed.
2/ Drop through the floor above and a 90° bend in to the side of the panel.
Ever tried getting 70mm² 3c through a 1½ inch inspection elbow?
Two options:
1/ Run the new feed down the wall at back the of the MCC through the floor and double back in to the bottom as the original feed.
2/ Drop through the floor above and a 90° bend in to the side of the panel.
Ever tried getting 70mm² 3c through a 1½ inch inspection elbow?