for me it is a case of,
measure Ze [or Ra] , measure Zs, measure R1 R2, Ze +R1+R2 = Zs, or if my measured Zs is higher (very doubtful) then its the highest reading I put down on my sheet,
BTW, I dont generally have an issue (in certain conditions) working Zs out using R1+R2 + Ze if a live test in not possible, [limitations box folks] ,
but I do find it unacceptable to reverse engineer this to R1 R2 being Zs-Ze , parrallell paths and all that [as pointed out]