Sod of a job.

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

kme

Fridge Keyholder™
Supporting Member
Joined
Mar 7, 2008
Messages
9,984
Reaction score
0
Location
In the office again.
External illuminated sign to a hotel. No CPC continuity. :(

SWA from main building. Underground.

SO............digicat & genny. plonk genny on cable phase (circuit disconn), and trace route.

Then put genn connection to armour, after removing gland from casing.

Discover location of earth breakPray

Dig - 4` down, through tree roots etc.........Grrrrrr

find cable. Meanwhile, out at the sign (10 M from problem)

find metal pattress buried in ground, with 3 flexes coming from it, and half a roll of blue insul tape wrapped around it.

1 flex (2 core) = supply!

1 flex (3 core) - feeds IP65 D/skt "for fairy lights at christmas"*_*_*

1 flex (3 core) - feeds illuminated sign.

n.b

1. the pattress is 10" horizontally from the public pavement outside the hotel.

2. The 2 no. 3 core flexes are "buried" approx. 1.5" deep:O

3. The SWA is fed from main intake, via BS88 fuse, contactor, and solid link rated 20A - 10mm 2 core

so - rip that lot out.

The flex that fed the sign runs to the leg of the sign, where there is a (buried) connector block, with red tape this time, 1" under the turf.

Supply & fit new IP65 RCD socket. Cut the old SWA, cold resin connection to the new socket, then to the sign.

By now, it`s about 6.30. Backfill, sweep up, jump in van........

The flaming battery has only gone t1t5 up while I was on the job - got to sort it in the morning, as I`ve a call earlyish.

I don`t like days like today:(

 
Top