Hi, I have a se6000h inverter which has 2 sets of MC4 connections are currently in use with 2 strings (one south facing x 11, panels and one west facing 12 panels)
270W panels all with solaredge optimisers. IO want to install a battery, would It be a case of just to combine the strings to free up a set of MC4 connections on the inverter? or will there be another piece of kit to purchase?
270W panels all with solaredge optimisers. IO want to install a battery, would It be a case of just to combine the strings to free up a set of MC4 connections on the inverter? or will there be another piece of kit to purchase?