Looking at changing a DB in a property, first problem is the cable used to supply existing DB from meter is 6mm twin and earth! Am i right in saying this has to be double insulated tails for this purpose, and now has to be 25mm cable???
Anyway, the real issue is there is no means of isolation internal of the property to isolate supply to work on DB, property is a flat and there is a bank of main fuses in communal area outside where main fuse is. Energy provider is stating they want to fit a double pole isolator and charge for the work, is this the case? Should there not be a means of isolation for the consumer to use as the consumer is resposible right back to tails supplying the DB so surely they must have to upgrade their supply so the consumer can isolate this point if they want to upgrade DB? Do they have a right to charge to fit this isolator???
Anyway, the real issue is there is no means of isolation internal of the property to isolate supply to work on DB, property is a flat and there is a bank of main fuses in communal area outside where main fuse is. Energy provider is stating they want to fit a double pole isolator and charge for the work, is this the case? Should there not be a means of isolation for the consumer to use as the consumer is resposible right back to tails supplying the DB so surely they must have to upgrade their supply so the consumer can isolate this point if they want to upgrade DB? Do they have a right to charge to fit this isolator???