following from a recent discussion I have had with our DNO about frequent powercuts we have been having,
5 since christmas,
I have had a return phone call to inform me that we are now going to have our TNS supply TNCS and PME'd .
WTF , ?
talk about doing everything but calling the woman the antich***t herself.!!!!!
she actually seemed quite knowledgable, as she was when I rang up about the power failures in the first place,
but,
would NOT guarantee that my house would be rodded at the point of entry, in fact went as far as to say it would be very unlikely there would be any rods in the vicinity apart from the main split points and transformer, or where they have dug up to repair the faulty cable, 500yds away at least, and about 30 houses minimum fed from that phase, so thats at 30 joints missing rods.
I think I need a bigger generator, headbang
anyone got any rods going cheap?
5 since christmas,
I have had a return phone call to inform me that we are now going to have our TNS supply TNCS and PME'd .
WTF , ?
talk about doing everything but calling the woman the antich***t herself.!!!!!
she actually seemed quite knowledgable, as she was when I rang up about the power failures in the first place,
but,
would NOT guarantee that my house would be rodded at the point of entry, in fact went as far as to say it would be very unlikely there would be any rods in the vicinity apart from the main split points and transformer, or where they have dug up to repair the faulty cable, 500yds away at least, and about 30 houses minimum fed from that phase, so thats at 30 joints missing rods.
I think I need a bigger generator, headbang
anyone got any rods going cheap?