Steps,Sorry Bud, back to perfect world again!
The problem being the split between DNO & metering operator.
Cut outs are often not labelled!
Not sying this is right but it does happen.
May well be in contravention of ESQCR!
All,
PME is a means of connecting the CNE conductor in the DNO supply system to earth at multiple points - Protective Multiple Earthing.
I'm not defending the design criteria!
Look up the definitions in ESQCR & the associated guidance and cross reference these to BS7671.
BTW, BS7671:2008 triggered an update to the ESQCR when issued so they are interlinked.
HTH