length of 6491xWhen carrying out a method 2 long lead test on continuity, could i use an alternative? such as bellwire or something?
How about a kitchen sink :innocent :innocent, or anything you`ve got to hand - as long as it conducts..............
Now... where does it say you need to maintain bonding continuity to a kitchen sink?Then determine if the sink pipes are earthed. Maybe the kitchen fitter used plastic push fit things on the additional pipework he installed and didn't maintain bonding continuity?
So if it has a TNCS service head, and you couldn't see an earth connected to it, why didn't you connect an earth from the earth terminal on the head to the MET?I didn’t see an earthing conductor, I didn’t see an earthing conductor coming from the supply sheaf (TN-S) and I didn’t see an earthing conductor coming from the service head (TN-C-S)