So WE have to bond withing 600mm of point of entry or before a branch.
Scenario. Gas meter at front of house. LONG steel pipe all the way round to the back where it branches and enters the property in 2 places for the gas cooker and boiler.
I am planning to put the bond just before the branch. I can't get it to within 600mm of entry to the building without bonding after the branch.
But what will the next gas safe man say? do THEY expect the bond all the way round to the meter?
Scenario. Gas meter at front of house. LONG steel pipe all the way round to the back where it branches and enters the property in 2 places for the gas cooker and boiler.
I am planning to put the bond just before the branch. I can't get it to within 600mm of entry to the building without bonding after the branch.
But what will the next gas safe man say? do THEY expect the bond all the way round to the meter?