Well, I have 1 week left of my notice, I then pick up my redundancy. I still have no job to go to, however, next week (5 days) I have 3 second fixes to do (take about 2 days), a first fix on a new kitchen (1-2 days) and a first fix for 4 new electric heaters (1-2 days). I am also entitled to a day off during the week!
I will also have the second fix to do once the kitchen is in (up to 2 weeks later).
Even with my bad calcs, I can see I won't be able to fit all this in a week.
My current boss says he will ask me in when the 2nd fixes are needed.
This is all very well if I don't have another job to go to, as I will need the money, but should I? ?:|
I will also have the second fix to do once the kitchen is in (up to 2 weeks later).
Even with my bad calcs, I can see I won't be able to fit all this in a week.
My current boss says he will ask me in when the 2nd fixes are needed.
This is all very well if I don't have another job to go to, as I will need the money, but should I? ?:|