Two jobs and two heaps of s*ite.
That's what I said, haha.WHAT:O:O Have they got a water cooled CU??? ; )
no - someone wired the ring main but forgot to take a cable into the board. the plug you see is feeding the circuit...Is that CU plugged into a 13a socket? So thats how you get incoming power is it? Learn summat new evry day.......
Dave last year on a new build the builder put in 4" duct using plastic brown soil pipe from where the plant room would be to the outside of the build ready for SSE to push their cable into plant room.On one new build the builder thought he was being helpful and buried a bit of 25mm blue MPDE pipe "for the electricity supply"The DNO, quite rightly, refused to feed their cable through a blue pipe, and insisted on a black duct being installed before they would install the supply.
builder should have pulled some duct through the soil pipe, sealed the ends of the soil pipe and say he has put the black duct in as requested...Dave last year on a new build the builder put in 4" duct using plastic brown soil pipe from where the plant room would be to the outside of the build ready for SSE to push their cable into plant room.About 10 months later they turned up and said no way, it has to be black, the builder could not do anything about it and they had to dig a trench around the outside of the building across a finished block path to get into plant room, took them 3 days, such a shame with 4" brown duct wasted.
its coloured so anyone digging a hole knoews whats in it.Old imperial water pipe is black. Can't see why the colour should matter.
shouldnt they be using grey?! or possibly greenBT used it in the end so it was not wasted.
Well the Scottish Half of SSE are happy with 2" black ducting. I don't see why the southern half of the "same" company should have different rules.Well that would have worked but SSE wanted a black 5" duct, and the soil pipe was smaller.They were 100% correct, and the builder should read their brief.
Running a smaller duct inside was not an option, if the floor inside the building was dug up for some reason it would look like a waste pipe.
BT used it in the end so it was not wasted.
probably different staff with different ideas. and we all know how communication is between large companies, even between the same officeWell the Scottish Half of SSE are happy with 2" black ducting. I don't see why the southern half of the "same" company should have different rules.
Well Dave it was to allow excess heat to dissipate, so they explained.Well the Scottish Half of SSE are happy with 2" black ducting. I don't see why the southern half of the "same" company should have different rules.