Power Ball
Senior Member
I went to look at a job yesterday and would like your thoughts/ideas. It is an empty property (Ex Council) i think, three bedrooms, front room, lounge, Kitchen, downstairs loo and a bathroom.
The guy asked me to give it a look over before he moves in and basicaly all wiring looks in good order the main board is TT earth with two incoming fuses 1 to cover a split box for night storage heaters econ 7 and the other for the general electrics which is 1 80a RCD covering 1 wylex 6way 1 wylex 4 way both old rewired fuse type.
None of the sockets, switches and ceiling rose's have earth sleeving on them but apart from that i can't see anything wrong.
My thoughts are to change the old Wylex boards for 1 17th split board and sleeve all sockets lights etc. I have a cost in for the change of boards but not sure how much to charge to carry out the earth sleeving as I cant think how long it would take and any problems that might crop up while doing this.
What do you think regards time etc
Thanks in advance
Chas
The guy asked me to give it a look over before he moves in and basicaly all wiring looks in good order the main board is TT earth with two incoming fuses 1 to cover a split box for night storage heaters econ 7 and the other for the general electrics which is 1 80a RCD covering 1 wylex 6way 1 wylex 4 way both old rewired fuse type.
None of the sockets, switches and ceiling rose's have earth sleeving on them but apart from that i can't see anything wrong.
My thoughts are to change the old Wylex boards for 1 17th split board and sleeve all sockets lights etc. I have a cost in for the change of boards but not sure how much to charge to carry out the earth sleeving as I cant think how long it would take and any problems that might crop up while doing this.
What do you think regards time etc
Thanks in advance
Chas