Hi all,
It's a static wooden lodge, from talking to the owner it was built off site in two sections then bolted together.
I popped in and had a quick look today all the internal wiring appears to be T&E. The system set up is like this:
1) Site supply 30ma RCD to 16a CEE Form. 2) 16a CEE...
Hi guys not posted for a while I hope all is going well for everyone.
Can anyone point me in the right direction?
I looking for guidance on inspection and testing of holiday lodges/caravans. I'm assuming that it would be treated as any other EICR?
what differences am I likely to encounter? ...
Hi all, this post is aimed at all you guys out there that are not Macbook retarded like myself. I want to change the whole of my business from the likes of Microsoft office e.g. excel and word over to the Mac equivilant as well as running easycert of my Macbook Air.
I have made up templates for...
Hi all just after some of your opinions - on a temporary install (event) do distribution circuits have to be RCD protectected? Finals would be (30mA). If all distribution circuits are effectively out of reach or in rated ramps with competent persons on site. Thanks All
I would give the dog its usual feed then take her out for a walk very soon after and stay out until nature takes its course, if she is prey driven give her the favourite toy, food driven give her a nice piece of meat etc and loads of praise. Then just repeat process and the penny will drop. Good...
Any future alteration would have to adhere to the regs so a reasonable competent person wouldn't have inspected what he was altering wouldn't he?
I have done this and labeled the socket and made the required notes as well as everything else on the cert.
Which if this ever landed at your feet...