ok found it.
Requirements of BS7671 connecting the PV a.c. mains.
At the connection to the a.c. mains, the PV supply cable must be connected to the supply side (i.e. upstream) of the OCPD's gor the final circuits in the electrical installation (regulation 712.411.3.2.11).
therefore, the PV...