Hi,
Im about to do my first solar project. I've have completed my Bpec PV course and have been a time served spark for 22 years.
I plan to install a 5.4KW Array and 5.4KW of battery storage on a large garrage building. The Garage has its own DB that is feed from another larger sub DB in the main house.
As the garage DB is full i intend to split the tails feeding the garage DB and install a small dedicated PV DB. I will then feed the inverter from the new PV DB with an MCB. I'm also running a cable back to the main intake for the CT for the inverter.
Am i correct in saying all i then need to do is affix warning labels at every DB all the way back to the main intake?
Is there anything else i should consider?
Cheers
Will
Im about to do my first solar project. I've have completed my Bpec PV course and have been a time served spark for 22 years.
I plan to install a 5.4KW Array and 5.4KW of battery storage on a large garrage building. The Garage has its own DB that is feed from another larger sub DB in the main house.
As the garage DB is full i intend to split the tails feeding the garage DB and install a small dedicated PV DB. I will then feed the inverter from the new PV DB with an MCB. I'm also running a cable back to the main intake for the CT for the inverter.
Am i correct in saying all i then need to do is affix warning labels at every DB all the way back to the main intake?
Is there anything else i should consider?
Cheers
Will