of courseAll due respect, but where else can the gas meter go?.........The numpty to me, is the one who put the DB in that position.
Eh? Its a house split into 2 flats, the meter cupboards full with 2 boards and 2 off peak boards. The gas meters new and could have been put anywhere but there.All due respect, but where else can the gas meter go?.........The numpty to me, is the one who put the DB in that position.
I'd have thought it common sense not to put the gas meter in front of the CU regardless of how the CU is installed. The CU was there first, so the gas meter can find somewhere else, even if the installer has to say to the customer "There's no room to put it there, make me some room or no gas"All due respect, but where else can the gas meter go?.........The numpty to me, is the one who put the DB in that position.
The meter fitters dont do the bonding, it can be passed to service and repair, or they can advise the customer to get their own independant engineer in.I had to move them off the right hand side of the meter cupboard so it could be cut out. There's a lack of bonding too, how do they get away with it?
a stand a lone regulator could of been used and and it could of been hardpipedlook where the gas outlet is, do you think the meter fitter is going to relocate that? There is only a short flexipipe to attach to that. So just put 2+2 together.Wet Fish
I was going to make a similar comment when i posted that :^OWTF do you live,?the sun was shining?
:C
Enter your email address to join: