This has cropped up yet again , I've had a scan of the BRB etc. but as I thought , there is no mention of it.
On a large extension out in the sticks , EON are re-routing the overheads to our new meter c/bd (TT) Customer is dealing with them , and left a message with the builder that I will should fit a Sw/fuse for the meter tails , which will be about 8 mtrs long.
The way I have always dealt with this situation is to demand they leave an isolator after the meter and the consumer's tails are protected by the service fuse .
The fuse business crops up from time to time but I can't see the point of having two 100A fuses downstream .
So , is there anything carved in stone ' cos if it is , I don't know where it is.
On a large extension out in the sticks , EON are re-routing the overheads to our new meter c/bd (TT) Customer is dealing with them , and left a message with the builder that I will should fit a Sw/fuse for the meter tails , which will be about 8 mtrs long.
The way I have always dealt with this situation is to demand they leave an isolator after the meter and the consumer's tails are protected by the service fuse .
The fuse business crops up from time to time but I can't see the point of having two 100A fuses downstream .
So , is there anything carved in stone ' cos if it is , I don't know where it is.