Pmeeke
Junior Member
- Joined
- Jul 30, 2012
- Messages
- 1
- Reaction score
- 0
i recently checked a job and noticed a new gas pipe has not been bonded. My question is does it need bonded. It is a commercial kitchen, at the moment the gas meter is outside and the old supply is what seems to be a 2" pipe enters the building and is bonded as it enters the building in that room with a 16mm cable (this supply is still used). the problem is an additional pipe has been tee'd off the supply outside after the meter and enters the building in a what seems to be 6" pipe. Would i need to run another seperate bonding conductor to this pipe as it enters the building or can i simply supplementry bond the 2" and 6" pipe?