Lillpete
Senior Member
- Joined
- Jan 18, 2009
- Messages
- 214
- Reaction score
- 0
I'm going to be completing a ccu upgrade on Friday which I will use for my NIC assessment, I have some Kewtech installation Certs but looking at them they are missing a number of boxes compared to the NIC ones I used to fill out (whilst employed) I'm a bit concerned that the assessor won't like them?? I'm also panicking slightly about what charts and stickers to use I've got two colour and RCD stickers as well as "next periodic due" ready and safety earth for met anything else to consider.
It's TNS and there are 10mm bonds already in place
Also what do you think, is it acceptable to have lights and sockets in a lean to kitchen porchy type area which look hardwired to actually be plugged into a socket in the next room??
If Kewtech Certs are no good, is there anywhere I could download a better form or do they have to be carbon copy??
It's TNS and there are 10mm bonds already in place
Also what do you think, is it acceptable to have lights and sockets in a lean to kitchen porchy type area which look hardwired to actually be plugged into a socket in the next room??
If Kewtech Certs are no good, is there anywhere I could download a better form or do they have to be carbon copy??