I have a clean earth system used with a UPS, the DB is a single phase supply with a clean earth (rod) I have a few questions about it I'll bullet point them to try stop me rambling
- the clean earth (rod) and dirty earth (swa armouring from main panel) are ultimately joined at the DB through the casing so what's the point of a separate earth?
-r1 + r2, and Zs to clean or dirty earth?
- can I run a cpc from a local socket to provide a "dirty earth" for the ups sockets?
thanks
- the clean earth (rod) and dirty earth (swa armouring from main panel) are ultimately joined at the DB through the casing so what's the point of a separate earth?
-r1 + r2, and Zs to clean or dirty earth?
- can I run a cpc from a local socket to provide a "dirty earth" for the ups sockets?