Hi all,
I am currently calculating the load requirements of a new build and I'm a little confused on what I have to apply for socket outlets. Appendix 1 of the On-site guide Table 1B options 9 or 10? Option 10 seems to give me a lower loading factor than option 9 but I don't know if there is a hard and faast rule to which has to be used.
Any advise would be much appreciated.
Paul.
I am currently calculating the load requirements of a new build and I'm a little confused on what I have to apply for socket outlets. Appendix 1 of the On-site guide Table 1B options 9 or 10? Option 10 seems to give me a lower loading factor than option 9 but I don't know if there is a hard and faast rule to which has to be used.
Any advise would be much appreciated.
Paul.