Neil Neil orange peel
Member
- Joined
- Feb 20, 2020
- Messages
- 11
- Reaction score
- 0
Hi Guys,
Just wondering how people charge for EICR's?
I've seen one post mention a 'Day Rate' and estimate of number of days.
Is this the general feeling?
Or does anybody charge per circuit?
I mainly deal with domestics but have been asked to do a local Conservative Club, it has an attached dwelling fed from it's own isolator at the 3Ph incomer, an external club house supply and numerous DB's within the main building for floodlights, bar areas, stage, cellar pumps etc etc... 50 single phase final circuits with a few sub mains to the different DB's.
There may be some previous paperwork if the caretaker can find it.
I'm guessing that I'll need to draw up new plans for this site, although hopefully the guy will get them.
Obviously a lot of work will depend on how much I have to find out for myself with regard to circuit layout and design.
I'd like to charge fairly obviously but if this is my first real step in to commercial working as a self employed spark, I don't want to scare them off with an unrealistic high price.
Any thoughts?
Thanks in advance chaps.
Neil.
Just wondering how people charge for EICR's?
I've seen one post mention a 'Day Rate' and estimate of number of days.
Is this the general feeling?
Or does anybody charge per circuit?
I mainly deal with domestics but have been asked to do a local Conservative Club, it has an attached dwelling fed from it's own isolator at the 3Ph incomer, an external club house supply and numerous DB's within the main building for floodlights, bar areas, stage, cellar pumps etc etc... 50 single phase final circuits with a few sub mains to the different DB's.
There may be some previous paperwork if the caretaker can find it.
I'm guessing that I'll need to draw up new plans for this site, although hopefully the guy will get them.
Obviously a lot of work will depend on how much I have to find out for myself with regard to circuit layout and design.
I'd like to charge fairly obviously but if this is my first real step in to commercial working as a self employed spark, I don't want to scare them off with an unrealistic high price.
Any thoughts?
Thanks in advance chaps.
Neil.