sellers
Well-known member
- Joined
- Feb 2, 2009
- Messages
- 2,582
- Reaction score
- -2
wow, just got back from pricing up a job that took 2hours, couldn't get away from the guy!!!
What we have is 2blocks of flats with 12flats in each. each block has its own mains room. Theres a block of garages which the customer wants power to his. The commitee who look after the grounds costs aren't keen.
His idea was to come off a bin store which is next to his garage, that has a small DB in it. So from there to a meter and to a db in his garage. Good idea but problem is as follows.
Bin store DB has a 5amp lighting circuit, a 20amp radial to one socket, and an unknown 20amp circuit. The board is proffessionally fed with a 1.5 2core SWA!!!! nice!! Investigate further into mains room, swa is spured of a radial socket circuit (not fused) then 2.5 radial socket circuit is on a 30amp re-wireable, but theres more, its got 2 fuse wires in the fuse.
Before I can even think about using a way in the binstore DB the supply needs sorting. So i need to give it a good slateing with regs to pursuade the commitee it is totally dangerous. (specs? ) Then this poor man can have power to his garage.
Also, if I upgrade the supply to this DB, do i need to test the outgoing circuits?
What we have is 2blocks of flats with 12flats in each. each block has its own mains room. Theres a block of garages which the customer wants power to his. The commitee who look after the grounds costs aren't keen.
His idea was to come off a bin store which is next to his garage, that has a small DB in it. So from there to a meter and to a db in his garage. Good idea but problem is as follows.
Bin store DB has a 5amp lighting circuit, a 20amp radial to one socket, and an unknown 20amp circuit. The board is proffessionally fed with a 1.5 2core SWA!!!! nice!! Investigate further into mains room, swa is spured of a radial socket circuit (not fused) then 2.5 radial socket circuit is on a 30amp re-wireable, but theres more, its got 2 fuse wires in the fuse.
Before I can even think about using a way in the binstore DB the supply needs sorting. So i need to give it a good slateing with regs to pursuade the commitee it is totally dangerous. (specs? ) Then this poor man can have power to his garage.
Also, if I upgrade the supply to this DB, do i need to test the outgoing circuits?