I Made A Plumber's Tool...

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Cheers. Someone on another forum reckons to just shift the prongs to the inside and I should be good to go. Less chance of it springing off as it's PEX rather than Pert.

As I've not even got a manifold yet I was thinking on the same lines for testing i.e. lash something up. In fact for a good while it won't be even connected, manifold or not as I'm having to leave 10' tails where it comes out the door as the room it goes across isn't trenched yet to get to where the manifold's going.
is 10" tails enough? shouldn't you give yourself enough pipe to get you to where the manifold will be sited. else you will have joints under the floor

 
is 10" tails enough? shouldn't you give yourself enough pipe to get you to where the manifold will be sited. else you will have joints under the floor
10 FOOT, look again!   :lol:

EDIT: Just asked the missus and she said she'd be more than happy with 10......
default_tongue%20in%20cheek.png


 
Last edited by a moderator:
Going to lay a length of capped off 20mm galv conduit in the slab for a temperature probe.....just in case it's ever required.

 
Top