Duncan Bennett
Junior Member
- Joined
- Feb 22, 2012
- Messages
- 12
- Reaction score
- 0
I'm just returning to the trade following a happy hiatus of some 15 years.
I've just sat and passed my 17th Edition course and H&S. Now I have to get back to reality.
I'm pricing a job to install an extractor fan in a kitchen roof. Am I right in assuming that (as I would have done years ago)I can take a spur off the existing lighting circuit supply to a cord-pull switch, and that I don't have to install a fused spur unit somewhere before the cord-pull. The circuit is protected by a 6amp MCB, but there is no RCD protection.
Also, if my assumption is wrong, can someone please point me to the section of the 17th that covers it? I've spent an hour trawling through the pages already :C
Thanks again.
Dunc
I've just sat and passed my 17th Edition course and H&S. Now I have to get back to reality.
I'm pricing a job to install an extractor fan in a kitchen roof. Am I right in assuming that (as I would have done years ago)I can take a spur off the existing lighting circuit supply to a cord-pull switch, and that I don't have to install a fused spur unit somewhere before the cord-pull. The circuit is protected by a 6amp MCB, but there is no RCD protection.
Also, if my assumption is wrong, can someone please point me to the section of the 17th that covers it? I've spent an hour trawling through the pages already :C
Thanks again.
Dunc