Seen as I've pulled the pics off the phone, thought I'd post them.
This is a toilet block for a small 3 workshop industrial setup on a farm, fed via 10mtr submain from tp board on opposite side of wall.
Meter
New cu
2x sockets
1x fcu for water heater in loft space
2x extractors
1x tube heater
Lighting
1x em down light (by cu)
3x pir
1x masterseal light switch
1x bulkhead
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00168.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00167.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00167.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00171.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00169.jpg
Not a big job but was pure profit (all materials left over from other jobs) bar the meter & pir's.
.
This is a toilet block for a small 3 workshop industrial setup on a farm, fed via 10mtr submain from tp board on opposite side of wall.
Meter
New cu
2x sockets
1x fcu for water heater in loft space
2x extractors
1x tube heater
Lighting
1x em down light (by cu)
3x pir
1x masterseal light switch
1x bulkhead
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00168.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00167.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00167.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00171.jpg
http://i83.photobucket.com/albums/j293/gazjothomas/DSC00169.jpg
Not a big job but was pure profit (all materials left over from other jobs) bar the meter & pir's.
.