up to now if its above 0.35 tncs
0.8 tns then i have rang them.
The lowest i got was 0.40 on a tncs, which was out in the sticks but i rang them anyway, they sent someon out to test it, they went up the pole and said its fine. which is what i thought they would do.
The highest i got was about 12ohm on a tns. for this they came out made a few phone calls temp tncs connection, i got all my work done while they decided wether or not to start digging the road up, which i dont think they did in the end.
if its above the stated values then i ring them, it is theres and its up to them what they do about it.