ebow72
Junior Member
- Joined
- Apr 8, 2011
- Messages
- 16
- Reaction score
- 0
I am just after a bit of clarification really, if possible please.
I have just finished my Level 2 C&G 2330, with 1 term left to do plus all the exams (2391, AM2 and Part P) and whatever else will help.
Anyway, I have been doing some electrical work here and there for friends, family and word of mouth. It's been mainly replacing switches, sockets, moving light pendants, replacing breakers. Work I am confident doing. But what is the cut off point? As regards Part P? I know that new installs, rewires and adding a new circuit are a no no, but most other jobs are non notifiable then? If a rewire was done, would I need a qualified spark to complete testing and sign it off? I have been offered jobs like that, but have had to say no, just as I don't want to enter into something I am not legally allowed to do..
Any help would be appreciated..
Thanks
I have just finished my Level 2 C&G 2330, with 1 term left to do plus all the exams (2391, AM2 and Part P) and whatever else will help.
Anyway, I have been doing some electrical work here and there for friends, family and word of mouth. It's been mainly replacing switches, sockets, moving light pendants, replacing breakers. Work I am confident doing. But what is the cut off point? As regards Part P? I know that new installs, rewires and adding a new circuit are a no no, but most other jobs are non notifiable then? If a rewire was done, would I need a qualified spark to complete testing and sign it off? I have been offered jobs like that, but have had to say no, just as I don't want to enter into something I am not legally allowed to do..
Any help would be appreciated..
Thanks