tom1
Distinguished Member
- Joined
- Aug 7, 2009
- Messages
- 2,330
- Reaction score
- 0
hello,
changed a cu in a house and one of the ring final is set up as,
ring too an enclosure then mutilpe spurs from this point to sockets this set up is a bodge and i think the best thing to do is treat it as radial and use a 20A mcb which will be adequate for the load. just want to see what you guys think
thanks
changed a cu in a house and one of the ring final is set up as,
ring too an enclosure then mutilpe spurs from this point to sockets this set up is a bodge and i think the best thing to do is treat it as radial and use a 20A mcb which will be adequate for the load. just want to see what you guys think
thanks