Passed accreditation

Talk Electrician Forum

Help Support Talk Electrician Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

binky

retired and loving it!
Supporting Member
Joined
May 7, 2008
Messages
15,045
Reaction score
1,998
Location
Sunny Plymouth
Thank firk for that, a very helpful NICEIC man. :^O

Just got to wait for official confirmration to come through and I can sap stickers all over the van. Need to tweak MCS docs, after that if someone wants acopy PM me and I'll see what I can do for a small bribe!!!

 
Well done mate , I may be in touch in the near future armed with a small bribe Guinness

Ste

 
I was a Quality Engineer at Nortel and ISO 900 was based an AQAP if you remember that from BAe. Oh and lots of non-earning time putting the system together.

 
I was a Quality Engineer at Nortel and ISO 900 was based an AQAP if you remember that from BAe. Oh and lots of non-earning time putting the system together.
The paper work often takes longer than the job, well done mate and good luck for the future.

I am going through the same process, we work to ISO 9000 standards as it is, so I do have a head start. Bae contracts have slowed down a bit in recent years with the cut backs, a company I was the "QS" for have been squeezed to the lowest quote just to keep the lads working.

 
Top