It was probably originally a voltage trip (yellow) and upgraded to a current RCD when the smart meter was fitted.
likewise, but I'm guessing the installer had run out of main switches...I’ve never seen a RCD fitted by a supplier. They wouldn’t do that
Enter your email address to join: