There is a two storey extension being built on the side of my house.
The footings have been dug out (1000mm ) and before being back filled with concrete , I want to run a 16mm SWA to an out building.
Can the cable be laid in the trench directly and the concrete poured over the cable?
The footings have been dug out (1000mm ) and before being back filled with concrete , I want to run a 16mm SWA to an out building.
Can the cable be laid in the trench directly and the concrete poured over the cable?