hi all, im looking for some advice, I have been asked to do a rewire on a 1st floor unit consisting of 7 offices and a communal area which has a small kitchen and toilets.
the job is over 150miles away from me so only in discussions with the customer at present and pictures they have sent me and details from there records.
right there was 3 fuse boards feeding this area and now they would like the following.
1 x new consumer unit in communal area (others are old wylex and would be in offices so all coming out)
there is only 2 x sockets and 2 x lights in each office (they do not want any more, which is strange)
couple of sockets to be installed in communal area with small kitchen area.
now my problem is this.
1. 1 of the old fuse boards were fed from a 3 phase db from a 63 amp mcb
2. 1 fuse board was then fed from the above fuse board
3. the last fuse board was fed from meter to a switch fuse with fuse rating of 60amp, then from there 20 meters to the consumer unit in 16mm twin and earth.
now what would you guys recommend I do for this?
get the switch fuse upgraded and then run armour to new consumer unit location? as its approx. 30meters away from the meter? this would be run up a box section to then above suspended ceiling to consumer unit? what size armour 16mm?
the owner has asked for fuse board configuration to be a socket & lighting circuit for each office and then same for communal area.
so there would be 8 socket circuits & 8 lighting circuits
I look forward to some advice on this, I am hopefully going to be able to drive to look at the job in next week or so , but at present my partner is pregnant and baby due any day so been trying to discuss as much with out driving there so i'm local if my partner goes into labour.
the job is over 150miles away from me so only in discussions with the customer at present and pictures they have sent me and details from there records.
right there was 3 fuse boards feeding this area and now they would like the following.
1 x new consumer unit in communal area (others are old wylex and would be in offices so all coming out)
there is only 2 x sockets and 2 x lights in each office (they do not want any more, which is strange)
couple of sockets to be installed in communal area with small kitchen area.
now my problem is this.
1. 1 of the old fuse boards were fed from a 3 phase db from a 63 amp mcb
2. 1 fuse board was then fed from the above fuse board
3. the last fuse board was fed from meter to a switch fuse with fuse rating of 60amp, then from there 20 meters to the consumer unit in 16mm twin and earth.
now what would you guys recommend I do for this?
get the switch fuse upgraded and then run armour to new consumer unit location? as its approx. 30meters away from the meter? this would be run up a box section to then above suspended ceiling to consumer unit? what size armour 16mm?
the owner has asked for fuse board configuration to be a socket & lighting circuit for each office and then same for communal area.
so there would be 8 socket circuits & 8 lighting circuits
I look forward to some advice on this, I am hopefully going to be able to drive to look at the job in next week or so , but at present my partner is pregnant and baby due any day so been trying to discuss as much with out driving there so i'm local if my partner goes into labour.