Anybody interested in a weeks work - all wanted.
Here`s the thing:
For one week only - no PV knowledge required.
Install will consist of:
4mm cable (FTE , SWA or occasionally SY) -from a "garage board" to an isolator, via generation meter. Then out of the iso, into an inverter. Job done.
2 or 3 a day, all localised to an area each day.
If you`re interested, PM me by Monday morning. No part P needed.
KME
Here`s the thing:
For one week only - no PV knowledge required.
Install will consist of:
4mm cable (FTE , SWA or occasionally SY) -from a "garage board" to an isolator, via generation meter. Then out of the iso, into an inverter. Job done.
2 or 3 a day, all localised to an area each day.
If you`re interested, PM me by Monday morning. No part P needed.
KME