Have a look see what you can find wrong in this pic.
Board is being changed out tomorrow, as the items it's supplying are urgently required & I'm not prepared to mess around trying to get a replacement RCD to fit, no one locally keeps CPN, and the nearest wholesalers is too far away to mess around.
Client needs the supply back on, so they are having a new board like it or not.
They are being priced this first though.
The RCD has an incoming supply but no outgoing supply and the test button does not function.
No further time for testing, that will come tomorrow, site was closing, and they wanted me to have some spare parts on site, so asked me to get replacement parts first and return after that.
IF there is an upstream fault then it's a DNO issue.
TT system, don't care particularly about discrimination at this point in time, once they have supply back I will discuss improvements.
The 4 SWA's are sub mains to temporary buildings (steel container type), and the 5th circuit is for the socket below.
I'm not on about the condensation either, though that may be what has goosed the RCD.
However, that is not the lack of supply/rcd/condensation faults I'm on about.
This board was refitted recently when the whole lot head, meter, and board was disconnected and removed and refitted into a new enclosure at the same location since the last time I looked at the site, not worked at the site, I hasten to add!
Not a quiz, not trying to score points, just have a look and see what I am not happy about.
Board is being changed out tomorrow, as the items it's supplying are urgently required & I'm not prepared to mess around trying to get a replacement RCD to fit, no one locally keeps CPN, and the nearest wholesalers is too far away to mess around.
Client needs the supply back on, so they are having a new board like it or not.
They are being priced this first though.
The RCD has an incoming supply but no outgoing supply and the test button does not function.
No further time for testing, that will come tomorrow, site was closing, and they wanted me to have some spare parts on site, so asked me to get replacement parts first and return after that.
IF there is an upstream fault then it's a DNO issue.
TT system, don't care particularly about discrimination at this point in time, once they have supply back I will discuss improvements.
The 4 SWA's are sub mains to temporary buildings (steel container type), and the 5th circuit is for the socket below.
I'm not on about the condensation either, though that may be what has goosed the RCD.
However, that is not the lack of supply/rcd/condensation faults I'm on about.
This board was refitted recently when the whole lot head, meter, and board was disconnected and removed and refitted into a new enclosure at the same location since the last time I looked at the site, not worked at the site, I hasten to add!
Not a quiz, not trying to score points, just have a look and see what I am not happy about.