Hi all.
Can somebody please try and clear something up for me.
I'm doing a Periodic Inspection in a medium sized unit.
There's a lot of exposed metalwork (extraneous-conducting-parts) and I'm wondering how much of it needs to be bonded. There's cable tray, unistrut, metal work benches etc and none of it appears to be done.
Thanks for any advice.
Chris
Can somebody please try and clear something up for me.
I'm doing a Periodic Inspection in a medium sized unit.
There's a lot of exposed metalwork (extraneous-conducting-parts) and I'm wondering how much of it needs to be bonded. There's cable tray, unistrut, metal work benches etc and none of it appears to be done.
Thanks for any advice.
Chris