working with some tilers a few month back - my part was only to install supply to control, and connect control to heating mat. (i didnt supply materials)
i turned up after 1 of 4 heat mats had been installed (to do some other unrelated work), and noticed that there was only the cable for the mat at the wall - no stat. i did mention this to the tiler, only to be told its built in with the heat mat.
few weeks later once everything is tiled, went back to connect up.
all 4 stats still in box.
i turned up after 1 of 4 heat mats had been installed (to do some other unrelated work), and noticed that there was only the cable for the mat at the wall - no stat. i did mention this to the tiler, only to be told its built in with the heat mat.
few weeks later once everything is tiled, went back to connect up.
all 4 stats still in box.