TheGreekGeek
New member
I am on a 3 fase circuit at a kent hospital where they want 2 unipact drylon machines installed as a hybrid for the smaller ones should i use the 400 or 240?
I think EAWR1989 reg 16, page 39 of memorandum of guidance, suggests that this work should not be undertaken by yourself...I am on a 3 fase circuit at a kent hospital where they want 2 unipact drylon machines installed as a hybrid for the smaller ones should i use the 400 or 240?
how long is the bit of string in my pocket? going to need a lot more info if we are to able to help.I am on a 3 fase circuit at a kent hospital where they want 2 unipact drylon machines installed as a hybrid for the smaller ones should i use the 400 or 240?
Here we go again.....how long is the bit of string in my pocket? going to need a lot more info if we are to able to help.
LOLHere we go again.....
as i have said on numerous previous occasions.....the piece of string is twice as long as it is from one end to the middle.
string is simple......i think the info required by the poster is a LOT more involved
just being
At least he is in a hospital.I don't know if its worth the risk to try and assist?
Can you be an accessory to injury/fatality via a forum?
with a bit of luk, Darwin will assist himI don't know if its worth the risk to try and assist?
Can you be an accessory to injury/fatality via a forum?
Still the same length as you have just used the existing piece of string, surely?LOL
if you tie the ends together to make a loop how long is it then???
Enter your email address to join: