some of the faults from todays PIR
most of the problems were carried out recently by a handyman. whilst writing report, i found a job list for him - every item on there was also on defect list :red card headbang .
lighting cable extended (switch is same)
turn the switch on and this is live....
switched moved to other side. cable now not in safe zone. and earth joined by twisting together. the L & SL is extended in 3 core flex with earth removed. the earth is a 1mm solid with sleeving over it....
3x rooms had new sockets installed. these were all installed as spur from spur. by the looks of it, he also cut a cable short and joined it
plugged tester into a socket to get Zs and says no neutral. spur fed from here
this is for the light (further up) with exposed conductors. might aswell keep the connections the same....
everywhere i looked, the list just kept getting longer
most of the problems were carried out recently by a handyman. whilst writing report, i found a job list for him - every item on there was also on defect list :red card headbang .
lighting cable extended (switch is same)
turn the switch on and this is live....
switched moved to other side. cable now not in safe zone. and earth joined by twisting together. the L & SL is extended in 3 core flex with earth removed. the earth is a 1mm solid with sleeving over it....
3x rooms had new sockets installed. these were all installed as spur from spur. by the looks of it, he also cut a cable short and joined it
plugged tester into a socket to get Zs and says no neutral. spur fed from here
this is for the light (further up) with exposed conductors. might aswell keep the connections the same....
everywhere i looked, the list just kept getting longer