Working on a Bathroom (Install shower, remove iffy Class 1 bar heater and change light fitting)...
Had a bit of a shock here today, VIR in place for all the lighting, nice conduit work..
There is some T&E feeds into the loft for additional lighting, I've rewired the bathroom light to this..
The property has 1 main old fuse board and 4 add on's ...........
Well over due for a rewire, but the property inside is a time warp...
And I won't forget to bond............
(One of those pressure operated gas boilers in the bathroom too..)
Had a bit of a shock here today, VIR in place for all the lighting, nice conduit work..
There is some T&E feeds into the loft for additional lighting, I've rewired the bathroom light to this..
The property has 1 main old fuse board and 4 add on's ...........
Well over due for a rewire, but the property inside is a time warp...
And I won't forget to bond............
(One of those pressure operated gas boilers in the bathroom too..)