Ash
Senior Member
- Joined
- Feb 15, 2010
- Messages
- 350
- Reaction score
- 0
I'm in a property being converted into two flats. The loft conversion had already been done, but it hadn't been signed off. We were in to do the rest
The owner wanted the builders I work with to sign off the building work and me sign off the electrical work
This is what I found
Looks odd?
Closer Look:
This was to feed the second board for the loft
Then this was all the feeds from the CU to the loft circuits
The owner wanted the builders I work with to sign off the building work and me sign off the electrical work
This is what I found
Looks odd?
Closer Look:
This was to feed the second board for the loft
Then this was all the feeds from the CU to the loft circuits