Went out yesterday evening to look at a job.
Rewire old VIR lighting circuit and cooker circuit (cooker circuit now supplies garage!)... had to break it to the old chap that I would need to add RCD protection and that there was very limited space within his meter cupboard to add it, so I could replace the 2 Wylex stds or add an enclosure just above the meter box for the RCD's.
Today I got together most of the prices ready for me to do the sums and then he phones me up "sorry to bother you, but I've changed my mind!"
Obviously I urged him to get these cables replaced and gave him a rouch price for the work, but I still think he'll leave it!
Rewire old VIR lighting circuit and cooker circuit (cooker circuit now supplies garage!)... had to break it to the old chap that I would need to add RCD protection and that there was very limited space within his meter cupboard to add it, so I could replace the 2 Wylex stds or add an enclosure just above the meter box for the RCD's.
Today I got together most of the prices ready for me to do the sums and then he phones me up "sorry to bother you, but I've changed my mind!"
Obviously I urged him to get these cables replaced and gave him a rouch price for the work, but I still think he'll leave it!