Latest one for me was
Fortnight ago went & first fixed a small single storey 2 room & hallway extension, I left the lad there to pull in the hallway lighting (he's been with me for 4 months & has a fair understanding of whats needed), while i nipped to neweys.
Gets there on Tuesday to second fix, all going well untill
Wheres the f***ing feed for the hallway lights, he'd used the switch box as the loop (no problem with that) but he got carried away & forgot to put the sl/n & cpc return to the down lights :_|
All walls & celings plastered & painted what a nightmare:O
lessons learnt
Me - I should double check everything & not assume its right
Him - I take the p*** all day when he c***s up
Fortnight ago went & first fixed a small single storey 2 room & hallway extension, I left the lad there to pull in the hallway lighting (he's been with me for 4 months & has a fair understanding of whats needed), while i nipped to neweys.
Gets there on Tuesday to second fix, all going well untill
Wheres the f***ing feed for the hallway lights, he'd used the switch box as the loop (no problem with that) but he got carried away & forgot to put the sl/n & cpc return to the down lights :_|
All walls & celings plastered & painted what a nightmare:O
lessons learnt
Me - I should double check everything & not assume its right
Him - I take the p*** all day when he c***s up