Reminds me of when I had a proper job and had to install a control panel in the USA.
Their elf n safety bods were all over us for the first day. NO live testing. To test for power to the cabinet, attach probes, shut cabinet (shutting probe cables in the door seal) switch on, take a reading, switch off, open door, move probes to next point.......
Good job they lost interest in us after day one. Then we could flick the panel door interlock switch into override position and carry on normally.
But of course first we had 2 days being taught how to use a ladder, and how to lift a heavy object.
Their elf n safety bods were all over us for the first day. NO live testing. To test for power to the cabinet, attach probes, shut cabinet (shutting probe cables in the door seal) switch on, take a reading, switch off, open door, move probes to next point.......
Good job they lost interest in us after day one. Then we could flick the panel door interlock switch into override position and carry on normally.
But of course first we had 2 days being taught how to use a ladder, and how to lift a heavy object.