A bit of clarification requested please.
In the garage I have a 20A device serving 1 double socket (2.5mm2 cable). I want to add a 2nd double socket. I know I can spur off the existing socket but the CU is exactly in the middle of the two sockets so it would mean less cable on the wall if I came direct from the CU for both sockets. Is this acceptable? Is it still classed as a spur? Or is this classed as a new circuit?
Thanks,
In the garage I have a 20A device serving 1 double socket (2.5mm2 cable). I want to add a 2nd double socket. I know I can spur off the existing socket but the CU is exactly in the middle of the two sockets so it would mean less cable on the wall if I came direct from the CU for both sockets. Is this acceptable? Is it still classed as a spur? Or is this classed as a new circuit?
Thanks,