I've done 100's of then Sidey. It was a project management requirement in the automotive engineering arena that both Design and process FMEAs are carried out by all responsible parties.
They are a very valuable tool, but are much misunderstood by many engineers and clues are often missed. Like the risk of failure of a rubber O ring on a solid fuel booster being 1:1,000,000 !!! It was this that shifted the emphasis from only re-evaluating high RPNs to also re-evaluating high severity scores (even when the occurence was very low).
They are a very valuable tool, but are much misunderstood by many engineers and clues are often missed. Like the risk of failure of a rubber O ring on a solid fuel booster being 1:1,000,000 !!! It was this that shifted the emphasis from only re-evaluating high RPNs to also re-evaluating high severity scores (even when the occurence was very low).