Hi all, now I know this is not the correct way to install this but bare with me.
One 3 phase 20amp machine has been installed
Been asked to install another, one problem... Needs a larger db to fit the new 20amp machine but they need it working tomorrow.
For short term use do u think I could double up on the 20a mcb? The machine will not be ran at the same time as one person will be working on them and can't use both together?
One 3 phase 20amp machine has been installed
Been asked to install another, one problem... Needs a larger db to fit the new 20amp machine but they need it working tomorrow.
For short term use do u think I could double up on the 20a mcb? The machine will not be ran at the same time as one person will be working on them and can't use both together?